01 Mar 2013
Laser Grading Project
This is a laser grading project we did here in Spokane. We prepped the site for a prefabricated garage. The grade was +/- 1/4″ when the laser grading was complete, which is very tight.
31 Mar 2011
Sewer Repair in Spokane
This was a great job- a win win for myself and the customer. The only bad part of sewer was under the driveway, which required only cutting 2′ ofF the length of the drive, leaving plenty of concrete for driveway and parking. With the savings the customer chose to tear out old shrubbery, lay down weed cloth and round rock. Its hard to believe its the same job.